Tuesday, October 28, 2025

Laying up - Canvas Work - Part 2

Saturday 4th


One bag finished for the emergency ladders, I made them a little thicker and considerably longer to help with packing and to reduce the pressure on the longer strip of velcro closure but they are a tad shallower so hopefully will  not be bashed about quite as much by the waves. A lot of work, about a day, to save c £85 (allowing for materials), the next one should not take quite as long now I am getting more adept at the stitching and I have a design. Friday 10th: The second one (top) actually took about the same time but is rather neater.

Outside.
Hull side.
Inside

Monday 6th


Two patches made ready for the spray hood and three patches completed on Blue Performance halyard bags, I don't recommend these - various small bits (one shown top right, the shock cord was originally covered)  fell to bits after a couple of years due to not being UV resistant, the two I have left are not in direct sunlight. but still suffered. The bag on the mast was more exposed and had more susceptible bits (I notice that F4 have stopped selling those) and was thrown away after just two seasons. They also fade quickly, not good on bags costing £60 and above.

Tuesday 28th


Now I have started the amount of canvas work is growing:

  • Cover for the SeaFeather Servo Blade. Removing the blade requires the dinghy, not a problem when on a mooring but a pain when bows in on a pontoon.
  • A double halyard bag for the mast (in process), the two off the peg bags on the mast are OK but not ideal so they are going to be reused around the cockpit, replacing one that is beyond cleaning and repair.
  • Cover for the tiller that hopefully will reduce the number of times it needs re-varnishing.
I suspect there will be one or two more projects that will occur to me.

Sunday 2nd November


The double Halyard bag for the mast is finally finished, an awful lot of work hand stitching!

The flash makes them look light, it is actually the same material
as the servo blade cover above and a reasonable match with
the stack pack.
They are a lot deeper than the ones being replaced which were
a little bit small for the spinnaker halyard when the sail was set.
Hopefully the large covers with Velcro fastening fastening will
keep most of the rain out.




Thursday, October 23, 2025

Laying Up - Ashore

With awful weather predicted for Monday I went to the boat on Sunday afternoon to do some work before the haul out on Wednesday, that worked out well as I got some useful odds and ends done on Sunday, then on Monday I installed a new water tank - the water was starting to smell, even with purification tabs, sterilisation back in March and a filter. 

I had also decided that the boat was trimmed too far down in the stern due to:

  • Moving the water tank with 40 - 50 Kilos of water aft when I replaced the fuel tank.
  • The larger steel fuel tank replacing a bladder plus a couple of cans of spare, put 100 Litres of fuel totalling c 120 Kg, with tank, a long way aft.
  • Carrying the dingy on the roof rather than forward.
  • Stowing my two long and heavy ropes (80m of 14mm & 100 or 12mm) in the quarter berth.
So using the original deck fitting the bladder tank is in the forepeak with the on-demand electric pump under a saloon berth which frees up a little room in the under sink locker. The ropes are also now in the forepeak leaving more room for the heavy weather and storm jibs in the quarter berth and giving better access to all. They can easily be moved back if necessary.

Tuesday saw a lot of odd jobs done and Sancerre was hauled out at 09:00 on Wednesday with essentially no wind it was very straightforward, unlike last year when I had >20 knots of wind blowing me into the hoist requiring the engine to be running astern for at least the last hundred yards which makes steering tricky with the prop walk.

 
On Tuesday it was me queuing behind the previous
boat to be lifted.
I was very pleased with the state of the hull, the change of location and anti-foul has made a big difference, she looks dirty but it was mainly slime with no weed or Barnacles on the main part of the hull. There was a good crop of Barnacles and small limpets in a couple of places where there was little or no anti-foul such as on the shaft where a anode had come off, the underneath of the keel and rudder and on the rope cutter. The prop was also good and was cleaned of growth from the last few months with a gentle wipe with a cloth and the "Pellerclean" has been on since July 2023. 

The clean spots are where the sling slipped
forward before being stopped by the safety lines.
This is a common issue with boats like the A9m,
Contessa 32, etc. with a sloping profile from
the forefoot to keel. It can be an expensive mistake
to omit the safety rope! Make sure the operators
knows it is required.
This may look dirty but it is nothing compared to previous years.
The bag over the propeller is to protect the "Pellerclean" anti-
foul coating from errant sprays from the power washer.
Mullet have been grazing on the rudder. The port side is dirtier
than the starboard side due to the right handed propeller and
being moored starboard side too keeping the sun off that side.
It cleaned up very well (pics if I remember next time down) and the question now is 2 or 3 coats of anti-foul? At £109.95 per 2.5 litres (RRP £157.68) one does not want to be profligate with it! Nor do I want to built up a thick coat of anti-foul which at some point might then need striping. Decision: I’m going for two coats generally but three on the skeg, rudder and three or four on leading edges.

The next visit will hopefully include re-marking the anchor chain and removing the last link that is a bit rusty due to contact with the stainless anchor swivel, prep work for anti-foul, cleaning the top sides, refitting the anchor locker cover removed for painting, refitting the removable parts of the Blakes sea cocks after cleaning, some anti-fouling and more. Work is never ending on a boat!

Wednesday, October 1, 2025

Laying Up - Rope and Canvas work.

Wednesday 1st October.


A new topping lift for the spinnaker pole. It took a while for a
suitable reel end to turn up and it is not my prefer colour but at a
40% discount I'll live with it, 17 metres x 8mm of my favoured
 premium braid on braid - Lyros Hercules £20.40.

I reused the shackle and it took c 45 minutes work to put a nice
mousing loop on one end (there is no core in the loop so it will
go through the mast sheeves) and the snap shackle on the other. It
would have been quicker but I forgot the snap shackle, realised
before it was too late, and had to back track.

I don't understand why more people don't do their own splicing.

Age is beginning to show on some of the canvas work with a few damaged areas due to chafe, also the bags containing the man overboard ladders are falling to pieces due to UV exposure although the ladders are fine and I could do with replacing a couple of halyard bags. Time to try my hand at canvas work!

8 years old, and until last winter on the boat most of the year - with
the boat on the mooring in a fast flowing estuary this was essential
as transferring between dinghy and boat is a prime cause of going
overboard. I had thought to put a large canvas patch over the
damage but having looked at the construction and the extent
 of the damage I decided that it would be best to make new bags.
The ladder cleaned up reasonably well although I'll give it one
 last clean before fitting the new bag now that some stronger
 cleaner has arrived.
But before starting a fairly complicated job for a novice, some patch work for one of the dodgers and to cover two small slits in the stack pack.
The two aft lines have both chafed the canvas, the forward lines,
two a side, have a better lead and are undamaged. View from the
inside; a full length batten does through the white pocket and the
webbing loop to which the lazy jack is attached on the other side.
I lashed out £25 on what appears to be a brilliant tool, a
"Speedy Stitcher", advertised as a manual sewing machine
 which is not a big exaggeration, it was slow going on my
test piece but produces a good looking locked stich.
It turns out I could have saved some of the dosh, the needles
fit this very old equivalent that I inherited. And the bobbin
in the new version is a waste of time because you can't get
rid of twists in the thread. But the old one is a bit small.
Patches ready to go, folds glued with PVA and left overnight.
OK, not pro standard but not too bad for a first attempt with
hand stitching, and they will certainly do the job.
Click here for part 2.