Well, apart from loading supplies, the dinghy, securing for sea etc. I had planned to do this later in the month but with dry and relatively warm weather forecast (that proved optimistic, it was darn cold at times) it was too good an opportunity to miss, and next week is out due to both cars going into the shop and a new washing machine to install.
Thursday, March 5, 2026
Ready to go!
Monday, February 16, 2026
More work on and off the boat.
A short but productive visit to the boat last week, I was lucky with the weather which was much better than forecast and despite a brisk wind it was warm enough on both days to work outside without cold weather clothing, that was not going to last and I only stayed one night rather than the two I had planned but I only skipped a couple of jobs and did a couple of extra ones.
First on the agenda after arriving on Wednesday in the early afternoon, was getting the mainsail and stack pack rigged before the weather had a chance to intervene, that proved a lot easier now than when I last had the stack pack off with the canvas more flexible.
Next was sorting out the kedge anchors and the rest of the anchoring and mooring gear, probably not a good idea as my back is still suffering, the newly demoted Lewmar Delta kedge is now in it's new home and the 10m of 8mm chain I would have used with a kedge is off the boat now being too heavy for me to move around comfortably, it has been replaced by a 5m length with new shackles.
Then I patched the sprayhood back drop that had suffered from chafe during the winter storms and refitted the revarnished tiller with its new cover.
In the evening, whilst the rain came down, I had a go at tidying up the electrics, not a lot of work as I wasn't going to take it all to pieces, not super tidy but an improvement.
![]() |
![]() |
| Refurbished bolt croppers. |
As usual when I am on the boat I find more jobs to do, this time as well as the spray hood issue, when checking the tools in the heavy items locker I found the emergency bolt croppers rusted up, probably because, being too big for the tool bag, they were stored next to the kedge anchors that I have used occasionally to back up the bower and were probably wet when stowed.
A new pair would only be about £12 but I don't like throwing away tools so I had it home, with difficulty got it to pieces, cleaned up and painted. A good 3 hours work but in retrospect I think it would be best to paint unpainted parts of a new one as a preventative measure so perhaps only a couple of hours net. I suspect Sir Robin would approve:
"Maybe I am getting dated but, when I first started sailing more than 50 years ago, if something broke we fixed it if it was at all possible. Buying new was a last resort as money was always scarce, but in any case we had been taught to take care of our tools, and it stood us in good stead. When you get halfway across an ocean and need to do an urgent repair, it is not the time to discover that the tools are rusted up and probably some are missing because they have not been put away properly. Try finding a chandlery in mid-ocean!"
Knox-Johnston, Robin. Knox-Johnston on Seamanship & Seafaring: Lessons & experiences from the 50 years since the start of his record breaking voyage (pp. 119-120). Fernhurst Books
As an aside, the bolt croppers are a back up emergency tool in case of dismasting or similar, the primary tool is a battery powered angle grinder with cutting disks which would go through rigging, and spars, like butter. But it could be dangerous to use in a rough sea and it might not work after a ducking so I carry the croppers as well.
Only one long, perhaps three night, visit to the boat is now required before I go sailing, an hours work to secure the newly installed water tank, a couple more to clean and reproof the spray hood and then a lot of work to get all of the rigging re-rove and maintenance gear off the boat. Then I will be ready for Ireland, when the weather permits.
Saturday, January 17, 2026
Engine work and more.
Fuel Filter Assembly.
| Yanmar fuel filter assembly. |
Fitting was straight forward and I had previously invested in a large assorted pack of copper crush washers so there was no need to hunt down the right size.
Thermostat & hose replacement.
I had already replaced all of the hoses except the short piece to the thermostat that was probably original to the engine but I found a rub on the hose from the seacock to the water filter were it was too close to the engine sump being a little too long. With hose not costing that much I decided I might as well replace more and opted for a premium silicone at £10 per metre incl postage. Compared to rubber silicone hose is more resistant to high temperatures and some chemicals, is robust, more flexible and is smoother so that water can flow more easily.
![]() |
| Fuel filter top left, thermostat housing top centre between the two pieces of red hose, the lower piece is the bypass hose. Water filter left. Water pump bottom left. |
| The thermostat from "Parts4engines". |
The engine is not going to overheat because of this, presumably with the bypass blocked the water pressure forces the thermostat open as on starting there was plenty of water coming out of the exhaust. Normally the thermostat does not start to restrict water through the bypass until the water in the outlet is 42°C vs a summer input temperature of 8 - 15°C and it should be fully open with the water temperature at 52°C at which point it completely blocks the bypass to force all of the cooling water through the block and cylinder head.
Wednesday 21st.
![]() |
| A new bag for the throw bag, the bean bag weight and line, minus a couple of feet that has been exposed to the sun, reused. |
![]() |
| A cover for the tiller to preserve the rather good varnish finish. Only try this using hand stitching if you have a lot of spare time! |
Saturday, December 27, 2025
Continuing winter work & a new anchor.
Monday 12th January
![]() |
| It is being cleaned with "brick" cleaner (acid) to remove a lot of crud and will then be treated with "Fertran" before being painted and returned to the boat. |
![]() |
| Done, just need to seize the first shackle when it gets to the boat. |
Saturday 27th December
It is rather more comfortable working at home, but annoying when you realise that you need something that is on the boat 200 miles away, this time the sail makers kit I need to make a cover for the newly varnished tiller and to remake the throw bag that, like the emergency ladders, has suffered from UV and is starting to fall to pieces; planned obsolescence I suspect, straight forward canvas would last longer, the current one is the second I have bought and about 4 years old. Still there should be plenty of time to make those after my next visit to Milford which will be as soon as we get a warm spell.
![]() |
| Fitted. The holder on the left is for the hand held VHF. Also shown, the emergency knife, EPIRB mount, strobe and head light, all within easy reach of the cockpit. |
![]() |
| Some repainting of engine bits in process, about 3 days more for the air filter cover and one or two for the water pump. |
| Getting there. |
Tuesday
| All done, now waiting for sensible weather to get to the boat. |
Monday, December 8, 2025
Trying to get the boat back in the water.
Sancerre was scheduled to launch last Friday, the 5th, but strong winds and heavy rain prevented that. Probably not a bad thing as the very wet weather meant the anti-fouling was behind schedule. The launch was rescheduled for the following Tuesday the 9th.
![]() |
| Pics by Windjammer Marine |
| No "proper" boat work to do at home so back to models. |
![]() |
| Anodes changed and shaft primed for antifoul where left bare by slightly shorter Aluminium Anodes. Also a coat of silicone on the propeller. Various other jobs done and ready for launch! |
Friday, November 14, 2025
Refurbishing a Seagull outboard - Part 2.
| After part 1. |
As described in Part 1 I did a lot of restoration work on my 1976 vintage Seagull 40+ last winter, unfortunately the fuel tap leak that I had thought cured hadn't been, when I came to fill it up to take it on this years cruise the fuel that I had left in it had disappeared and replacement fuel gushed out. The cork had shrunk again and there was no time to replace it so the Mariner came with me, but was not used as I was able to row ashore on the odd occasion I used the dinghy.
I have now embarked on a second phase of restoration including:
- Fuel tap cork replaced, tap polished and lacquered.
- Exhaust polished, more cleaning and paint to touch up.
- The bronze mounting bracket had started to go green, even in the garage, so cleaned and will be lacquered as soon as the humidity drops.
- The tiller is being replaced: Mine had been broken at some point and been replaced with a piece of copper water pipe which had been poorly painted and had some dings in it. At only £5 from Saving old Seagulls a replacement was a better bet than filling or removing dents and repainting.
![]() |
| The repaired tiller arm stripped of paint. |
![]() |
| The "new" tiller, goodness knows where this had been stored. |
![]() |
| Cleaned up with a NOS throttle lever. The tiller is rather shiny now but should get a dull patina as it ages which will help to hide the remaining marks. |
![]() |
| Almost done, I just need to fit some split pins, polish up the exhaust and, when the laquear has hardened, refit the mounting bracket and I'm finished. Probably. |
Tuesday, October 28, 2025
Laying up - Canvas Work - Part 2
Saturday 4th
Monday 6th
Tuesday 28th
- Cover for the SeaFeather Servo Blade. Removing the blade requires the dinghy, not a problem when on a mooring but a pain when bows in on a pontoon.
- A double halyard bag for the mast (in process), the two off the peg bags on the mast are OK but not ideal so they are going to be reused around the cockpit, replacing one that is beyond cleaning and repair.
- Cover for the tiller that hopefully will reduce the number of times it needs re-varnishing.
Sunday 2nd November
![]() |
| The flash makes them look light, it is actually the same material as the servo blade cover above and a reasonable match with the stack pack. |
Thursday, October 23, 2025
Laying Up - Ashore
With awful weather predicted for Monday I went to the boat on Sunday afternoon to do some work before the haul out on Wednesday, that worked out well as I got some useful odds and ends done on Sunday, then on Monday I installed a new water tank - the water was starting to smell, even with purification tabs, sterilisation back in March and a filter.
I had also decided that the boat was trimmed too far down in the stern due to:
- Moving the water tank with 40 - 50 Kilos of water aft when I replaced the fuel tank.
- The larger steel fuel tank replacing a bladder plus a couple of cans of spare, put 100 Litres of fuel totalling c 120 Kg, with tank, a long way aft.
- Carrying the dingy on the roof rather than forward.
- Stowing my two long and heavy ropes (80m of 14mm & 100 or 12mm) in the quarter berth.
Tuesday saw a lot of odd jobs done and Sancerre was hauled out at 09:00 on Wednesday with essentially no wind it was very straightforward, unlike last year when I had >20 knots of wind blowing me into the hoist requiring the engine to be running astern for at least the last hundred yards which makes steering tricky with the prop walk.
![]() |
| Spot Sancerre (click to expand, answer below). Link to live cam (with adverts) |
| This may look dirty but it is nothing compared to previous years. The bag over the propeller is to protect the "Pellerclean" anti- foul coating from errant sprays from the power washer. |
| Mullet have been grazing on the rudder. The port side is dirtier than the starboard side due to the right handed propeller and being moored starboard side too keeping the sun off that side. |



.jpg)









.jpg)
.jpg)
.jpg)
.jpg)















