Sunday, March 14, 2021

New and updated information pages from the Covid-19 Lock Down

The entrance to Loch Ewe, 2020

In two weeks I can restart work on the boat and then hopefully I will be off sailing so will hopefully be blogging about that rather than doing any new pages of tips etc. Those that I have done are in various states of completion and I'll use the last two weeks of boredom to try and finish them, or at least tidy them up. All have a bias towards offshore single or short handed sailing but apply to crewed boats as well.

Most, but not all, are listed on the right hand panel (that may change with time to keep the list at about its current size). Here is a consolidated list. Links here all start in a new window.

Boat and equipment related pages:

Life at Sea:

Planning a single handed round GB trip:


Wednesday, January 27, 2021

Time to revise plans for 2021?

It is the end of January and things are not looking good for a launch in mid March and whatever happens in UK, my planned cruise to southern Brittainy in April is certainly a non starter. 

The Jester Baltimore (IRE) is scheduled to start on the 13th June, that might happen but socially distanced events before and after seem problematic. I had planned to to do the JBC, possibly starting from Pwllheli, as a change from Plymouth that I did in 2019, then either the Jester Azores Challenge which also looks unlikely for several reason or a round Ireland trip.  If that happens I have a gap in the schedule during May and possibly April and continuing uncertainty about going to Ireland.

Then add into the mix Covid-19 vaccination, unless things go very wrong with the vaccination schedule I will be in group 5 rather than 4 so I should have the first dose in time for any potential sailing but what about the second? Any decision on that will just have to wait.

With plenty of time on my hands in lock down I am planning for several options and only time will tell which will happen, the two main options are:

Option 1: Only if sailing is restricted into May and Ireland opens up (or announces) by late May (Sailing should start April 12th so jump to option 2!)

Cruise the south coast, Bristol Channel and West Wales arriving Pwellheli for the start of the JBC then if the weather is OK circumnavigate Ireland with a brief diversion to the Scottish Islands, which also avoids the over-falls around Rathlin Island by sailing from west of there direct to Islay returning in August. Then perhaps a quick trip to the Channel Islands in September.

The planning for option 1 is straight forward and now done.

A composite view of legs from Baltimore up the west coast of Ireland to
Islay. I have a number of alternates and diversions on route already in hand.
Screen shot from my seaPro navigation software. 

Option 2: If sailing is OK in England and Scotland from some time in April and the boat is back in the water and ready:

Sail round GB anticlockwise (as apposed to my clockwise trip last year) leaving in April, if the JBC is off take a leisurely route down the west coast of Scotland and England or down the either coast of Ireland if allowed. Or, if the JBC takes place then get to Pwllheli around the 10th June, do the JBC and come home from Baltimore.

Planning for option 2 is not a big job given that I have already been round the other way and already have routes on my PC and plotter, but is does illustrate some interesting points about planning long single handed coastal trips so I am going to spend some more of my lock down time with a few posts and tips on planning such a trip.

Watch this space and / or the consolidated list under "tips" from the panel to the right.

As of 23rd Feb option 2 is looking good. But its going to be a rush to get the boat in the water in only a couple of weeks.

But things keep changing, the JBC looks iffy due to Covid so it may turn into a Jester Fastnet Challenge,  Pwllheli - Fastnet Rock - Plymouth or for others start at either and finish at either. Four for the price of one.

Monday, December 28, 2020

Covid-19 Lockdown and Blog updates

Here we go again! In March 2020 the lockdown came just after I put Sancerre onto her mooring, so at least I did not have to pay for the marina berth through to the partial reopening in June. This year she is out of the water and due back on the mooring, which I have all year, in mid march.

One coat of antifoul done with the boot (white) line raised 
 to stop weed collecting on the gloss paint when the boat is
heavily loaded for extended cruising.

With the likelihood of further restrictions and to avoid possible harsh weather in January and February I put a lot of effort in from mid November when Sancerre came out of the water and managed to get the hull prepared and a single coat of antifoul on before the serious lockdown was announced and, with a last minute Christmas eve visit, I got the engine water pump back on, the Blake's seacocks for the toilet back in and the automatic bilge pump rewired with a new switch, so if the lockdown lasts into March, I will be able to get her back in the water and onto the mooring with a few days notice and one or two days on site, hopefully avoiding possible additional storage charges at the boat yard.

Unable to visit the boat to complete winter maintenance I am spending some of the time in (Tier 4 for the boat and separately for me) lockdown to put some additional info on here and to update some of the posts relating to my round GB trip in 2020.

In particular I have copied and expanded on a post I made on the owners group Flickr site when an owner of a smaller Achilles asked about the handling of the Achilles 9m, that with a good deal of other information, can be found by clicking on here (opens in a new window)  or on the "About the Achilles 9m and Sancerre" tab above (opens in this window).


I have also added a page of pictures from each of my cruises in Sancerre and have imbedded maps showing Sancerre's latest position and some historical info from AIS returns on the "Tracking Sancerre" tab above.

The next project, currently WIP is a page of hints on cooking and eating at sea.

Update: and with the new lock down there could well be a few more.

Wednesday, December 23, 2020

Refurbishing the engine water pump

The manual says to change the impeller every 1,000 hours (or earlier if an annual inspection shows damage) but like most owners I change the impeller every year, its not an expensive item, the additional work over an inspection is trivial and they have been known to fail after the engine has been unused for an extended period. 

This year however a bit more was required as the end plate was worn and needed replacement (again not expensive) so it seemed sensible to refurbish the unit as necessary and give it a couple of coats of paint after removing corrosion - the body of the pump is bronze and quickly goes green the mounting plate is steel so subject to rust, I chose some silver "Hammerite" that I already had as Yanmar coloured paint is silly money.

Removing crud, inside and out took some time but was a straight forward job that should not needed to be done again for several years.

The impeller was actually OK but was changed anyway.
The end plate was badly scored so also changed. Bearings
and the water seal were fortunately fine and did not have to
be replaced.

Almost ready to go, the liquid on the seal and lubricating
the impeller is Glycerine, oil will damage the rubber impeller.


The paint was redone in November 2023 after the impeller failed after one seasons use.

Friday, December 11, 2020

More propeller / shaft issues.

The refurbished 14" x 13" propeller.
 After haul out I found that the cutlass bearing, replaced last year at enormous cost because it was seized in position and the engine had to be moved forward to remove the shaft to chisel the bearing out, was again worn, not dangerously but enough to need replacement. Hopefully this time it will be an hours work and not expensive.


The question is why did it wear so quickly? It could have been a side effect from the various problems with the folding prop, but the previous bearing had worn rather quickly as well (I don't know how many hours it had run before I got the boat but I suspect not many). I therefore sent the prop off to Hamble Propellers for checking and sure enough it was out of balance and probably had been for some time. They dressed and balanced it so hopefully everything will be smoother next year and the cutlass bearing will last for much longer. Some superficial de-zincification was also removed and hopefully will not reoccur with the fitting of  a galvanic isolator and some extra bonding between metal parts, principally of the stern gantry which holds the solar panels and wind turbine.

A shame to cover up the shiny bronze but hopefully this
coating will keep it clear of weed, barnacles etc.


Monday, November 30, 2020

How to turn a 3 hour job into a 3 day one - upgrading the Battery compartment wiring.

With the main domestic batteries requiring replacement (explained in the previous post here) I decided that it would be a good opportunity to tidy up the main power distribution system which had grown by stages with items scattered around the battery areas, often in inconvenient places. Also the new batteries are shallower than the previous ones so that the already slightly dodgy and difficult to fit strong-back over them would no longer work.

During the round GB trip I only spent a limited time in marinas but destroyed 2 shaft anodes and an anode on the P bracket (on the A9m the P bracket is not electrically bonded to the engine etc. an anode is therefore a good idea). That was more erosion than I used to get from a year at Haslar Marina so clearly something was not right with the electrical system at one of the marinas and / or on nearby boats. I therefor decided to fit a Sterling Galvanic Isolator (AKA a Zinc saver), for a good description of the problem and solution see the Sterling Power website here (other suppliers also supply appropriate hardware). 

Of course on a boat things are never as simple as you would like and what I estimated as a 2 day job ended up taking three and my elegantly simple wiring scheme had to be abandoned when I found that the domestic main switch would only just take a single heavy duty flexible cable to each of the terminals, two was impossible. But finally it was finished and with the addition of 3 lashing points, extra wood battens, and a new shelf in the compartment, the batteries are more secure than ever.  

The re-done main battery compartment with the new galvanic isolator
(AKA a zinc saver) top right to protect the boat from Galvanic action
when connected to shore power. Below it are the shunts for the
battery monitors, to the left switched and non switched bus bars
and master fuses - The second battery bank has its own master fuse
close to it. (Updated Feb 2022 after minor changes).
This post shows how effective the galvanic isolator is.

Shore power circuitry (click for a larger view), 2 pole circuit
beakers should be used rather than single as sometime found.
Naturally I found more work to do, in this case replacing the bilge pump switch that one or more previous owners had rewired multiple times leaving it damaged and with the built in fuse bypassed, not expensive but annoying.
 
Power distribution and control (updated Feb 2022). For reasons
explained elsewhere I have 2 domestic battery banks so charging
management and switching is more complicated than usual.